Steel Post Repair for Leaning Wood Fences
Wood fence posts rot at ground level. We set a 2-3/8", 3", or 4" Schedule 40 steel pipe post beside each rotted post and fasten your fence to it. The old post and its concrete stay in the ground, so there is no digging up the old concrete, and your fence stays in place. It is a budget-friendly way to save an old fence.
From $305 / post installed. You see the price before you book.
4.7 on Google85+ reviews · Two Brothers Fencing
A photo of the fence helps, but you do not need one to book.
One of our steel post repairsWhy a Steel Post?
- Steel does not rot: the new post beside your old one is steel, not another wood 4x4.
- Preserves Existing Panels: Re-uses your good wood pickets and rails, so you are not paying for a full rebuild.
- Budget-friendly: a way to save an old fence without paying for a new one.
2-3/8" Schedule 40 Steel Pipe Retrofit
For 5ft to 6ft Wood Privacy & Picket Fences
3.0" Schedule 40 Heavy Steel Pipe
For 7ft to 8ft Fences & Sagging Gate Posts
4.0" Schedule 40 Commercial Gate Post
For Large Wood Vehicle Gates (10ft to 16ft Wide)
What's Included with 2-3/8" Schedule 40 Steel Pipe Retrofit:
Our crew sets a Schedule 40 steel pipe post beside each rotted post, straightens the fence and fastens your existing panels to the steel. The old post and its concrete stay in the ground.
Before & After: A Leaning 6' Wood Fence on Steel Posts
The pickets and rails stay, and so do the old posts. We set a steel post beside each rotted one, straighten the fence and fasten it to the steel.
Before
AfterWhy Wood Fence Posts Rot & How We Repair a Rotten Fence Post
Wood 4x4 posts rot at ground level. Once a post rots, it stops holding the fence up and the line starts to lean.
How the Repair Goes
Want the longer explanation? Read how to fix a leaning wood fence without replacing it.
How it works
- 1
Get your price
Use the calculator on this page, or text us a photo of the post and the fence on both sides of it and we will text back a price.
- 2
Pick your week
Choose the week that suits you. A 50% deposit by card holds it, and nothing is charged until then.
- 3
We do the work
We confirm your exact start day before the week begins. The balance is due when the job is done.
Common questions
Do you need to come out to give me a price?
No. Posts are priced each on this page. If you are not sure how many are bad, text us a photo of the fence line and we will text back a price. A photo helps, but you do not need one to book.
How soon can you do it?
You pick the week when you book, and the form shows the first open week. We confirm the exact day before it starts.
Can you keep my existing fence panels?
Yes. We do not take the fence apart. A steel post is set beside the rotted one and your fence is fastened to it.
Do you replace or dig out the rotten post?
No. The old post and its concrete stay in the ground. Setting a steel post beside it avoids digging up the footing, which makes a mess and can damage an old fence. It also keeps the cost down.
Why steel instead of another wood post?
Steel pipe does not rot at ground level the way a wood 4x4 does.
How do I pay?
Booking online charges nothing. A 50% deposit by card holds your week, and the balance is due when the work is done.